Planning Repository Work

Core principle

Organize accepted work into coherent, independently reviewable units around dependencies and evidence rather than arbitrary time boxes.

Do not use

Do not use this skill for one obvious local action, unresolved design or authority, open-ended exploration without a planning objective, or an adequate existing plan. Do not use planning to reopen accepted design decisions.

Procedure

  1. Confirm the accepted objective, applicable decisions, current repository state, and the boundary the plan may implement.
  2. Identify affected responsibilities, files or stable code surfaces, interfaces, tests, documentation, and compatibility obligations.
  3. Divide the work into units that each answer one review question and leave a coherent state. Avoid artificial microtasks.
  4. For every unit, state the outcome, owned surfaces, prerequisites, preserved behavior, validation, acceptance conditions, and stop boundary.
  5. Order units by dependency and risk. Put discovery or characterization ahead of irreversible or broad changes when it reduces uncertainty.
  6. Identify parallel work only where source and write scopes are independent and integration responsibility is explicit. Use sequential units when write scopes overlap but overall ownership and integration remain clear.
  7. Record project-owned commit, review, migration, rollout, rollback, or publication steps only when supplied by current policy or authority.
  8. End with the integrated verification and handoff needed to judge the whole objective, plus intentional deferrals.

Evidence scope and escalation

For behavior-bearing units, name the scoped unit evidence and changed-boundary integration evidence that match the claim. Separate unit replacement seams from integration real boundaries so the plan cannot describe a mocked boundary as integrated. Do not schedule combined, full, smoke, readiness, or release suites automatically; state the specific justification for the smallest expanded gate. Place readiness and release suites at their authorized checkpoints rather than treating them as ordinary completion tests.

Represent a coverage shortfall as a bounded coverage-remediation escalation: repair behavior and completeness first, inspect exact source ownership, expand through useful contracts in the project-owned order, and stop for disposition when that surface is exhausted. Do not create an open-ended task to “raise coverage” or pre-authorize denominator, threshold, rounding, or exclusion changes.

Project-owned parameters

The repository owns its file layout, phase model, task size, branch and commit policy, test commands, required artifacts, reviewer gates, deployment process, and report format. A plan references or instantiates those rules without turning them into APG defaults.

Evidence and completion

A completed plan is executable by a competent contributor without guessing the objective, ownership, dependencies, validation, or stop conditions. Exact line numbers and complete code are included only when they remain stable and material.

Stop or escalate

Stop when the objective or design is unaccepted, dependencies are unknown enough to make sequencing fictional, overall write authority or integration ownership is unresolved, a required migration or destructive action lacks authority, or planning reveals a new design decision.

Common mistakes